In 2013, RAPS Solutions Sdn Bhd was involved in the design and construction of a 4MW Solar Power Plant in Pasir Mas, Kelantan, strategically located in a flood prone location. During the national state of emergency in 2014 floods, our 4MW Solar Power Plant was able to withstand the flood water surges and the key fundamental to this was the careful planning and execution of the construction of this eco-friendly infrastructure